Example for Configuring PIM-SM

Example for Configuring PIM-SM

 


Networking Requirements

In the following topology, a multicast Source sends the multicast traffic to the Receiver through Switch C, Switch B and Switch A.

  • Configure ge-1/1/2 as an IGMP interface on Switch A which is connected to the Receiver.

  • In this example, the static route will be used to make the switches in PIM-SM domain can communicate with each other. 

Figure 1. PIM-SM Multicast Routing Configuration

Procedure

Switch A

Step1        Configure VLAN.

admin@XorPlus# set vlans vlan-id 2 l3-interface vlan-2 admin@XorPlus# set vlans vlan-id 3 l3-interface vlan-3 admin@XorPlus# set interface gigabit-ethernet ge-1/1/1 family ethernet-switching native-vlan-id 2 admin@XorPlus# set interface gigabit-ethernet ge-1/1/2 family ethernet-switching native-vlan-id 3 admin@XorPlus# set l3-interface vlan-interface vlan-2 address 10.10.1.1 prefix-length 24 admin@XorPlus# set l3-interface vlan-interface vlan-3 address 10.10.3.1 prefix-length 24

Step2        Enable IP routing.

admin@Xorplus# set ip routing enable true

Step3       Enable IGMP on the L3 VLAN interfaces of the PIM router connected to the receiver.

admin@XorPlus# set protocols igmp interface vlan-3

Step4       Enable PIM-SM on the L3 VLAN interfaces.

admin@XorPlus# set protocols pim interface vlan-2 sm admin@XorPlus# set protocols pim interface vlan-3 sm

Step5       Configure the VLAN interface vlan-2 on Switch A as the static RP.               

admin@XorPlus# set protocols pim rp 10.10.1.1 group 224.0.0.0/8

Step6       Configure static routes to other switches.

admin@XorPlus# set protocols static route 10.10.2.0/24 next-hop 10.10.1.2 admin@XorPlus# set protocols static route 10.10.4.0/24 next-hop 10.10.1.2

Step7       Commit the configurations.

admin@Xorplus# commit

Step8       Verify the configuration.

  • Run run show pim interface command to show information about all interfaces on which PIM-SM is enabled.

admin@XorPlus# run show pim interface Interface State Address PIM Nbrs PIM DR FHR IfChannels vlan-2 up 10.10.1.1 1 local 0 1 vlan-3 up 10.10.3.1 2 local 0 0
  • Run run show igmp interface command to show IGMP interface information.

admin@XorPlus# run show igmp interface Interface State Querier Timeout Version Groups ------------ -------- --------------- --------- --------- -------- vlan-2 DISABLED 10.10.1.1 None 2 0 vlan-3 UP 10.10.3.1 None 2 3  Interface State Address V Querier Query Timer Uptime vlan-2 up 10.10.1.1 3 local 00:00:40 02:13:12 vlan-3 mtrc 10.10.3.1 3 other --:--:-- 00:36:29

Switch B

Step1      Configure VLAN.

admin@XorPlus# set vlans vlan-id 2 l3-interface vlan-2 admin@XorPlus# set vlans vlan-id 3 l3-interface vlan-3 admin@XorPlus# set interface gigabit-ethernet ge-1/1/1 family ethernet-switching native-vlan-id 2 admin@XorPlus# set interface gigabit-ethernet ge-1/1/2 family ethernet-switching native-vlan-id 3 admin@XorPlus# set l3-interface vlan-interface vlan-2 address 10.10.1.2 prefix-length 24 admin@XorPlus# set l3-interface vlan-interface vlan-3 address 10.10.2.2 prefix-length 24 admin@XorPlus# set l3-interface loopback lo address 7.6.5.3 prefix-length 32

Step2        Enable IP routing.

admin@Xorplus# set ip routing enable true

Step3       Enable PIM-SM on the L3 VLAN interfaces.

admin@XorPlus# set protocols pim interface vlan-2 sm admin@XorPlus# set protocols pim interface vlan-3 sm

Step4       Configure the VLAN interface vlan-2 on Switch A as the static RP.               

admin@XorPlus# set protocols pim rp 10.10.1.1 group 224.0.0.0/8

Step5      Commit the configuration.

admin@Xorplus# commit

 

Switch C

Step1      Configure VLAN.

admin@XorPlus# set vlans vlan-id 2 l3-interface vlan-2 admin@XorPlus# set vlans vlan-id 3 l3-interface vlan-3 admin@XorPlus# set interface gigabit-ethernet ge-1/1/1 family ethernet-switching native-vlan-id 2 admin@XorPlus# set interface gigabit-ethernet ge-1/1/2 family ethernet-switching native-vlan-id 3 admin@XorPlus# set l3-interface vlan-interface vlan-2 address 10.10.2.1 prefix-length 24 admin@XorPlus# set l3-interface vlan-interface vlan-3 address 10.10.4.1 prefix-length 24

Step2        Enable IP routing.

admin@Xorplus# set ip routing enable true

Step3       Enable PIM-SM on the L3 VLAN interfaces.

admin@XorPlus# set protocols pim interface vlan-2 sm admin@XorPlus# set protocols pim interface vlan-3 sm

Step4       Configure the VLAN interface vlan-2 on Switch A as the static RP.               

admin@XorPlus# set protocols pim rp 10.10.1.1 group 224.0.0.0/8

Step5      Configure static routes to other switches.

admin@XorPlus#set protocols static route 10.10.1.0/24 next-hop 10.10.2.2 admin@XorPlus#set protocols static route 10.10.3.0/24 next-hop 10.10.2.2

Step6      Commit the configuration.

admin@Xorplus# commit

Step7      Verify the configuration.

  • Run run show pim interface command to show information about all interfaces on which PIM-SM is enabled.

admin@XorPlus# run show pim interface Interface State Address PIM Nbrs PIM DR FHR IfChannels vlan-2 up 10.10.2.1 0 local 0 1 vlan-3 up 10.10.4.1 0 local 0 0

Copyright © 2026 Pica8 Inc. All Rights Reserved.